View of the MCC Creech Base View of the MCC Creech Base View of the MCC Creech Base View of the MCC Creech Base View of the MCC Creech Base

INFORMATION

INFORMATION

MCC CREECH

  • 77,824 GSF
  • $20.1M

This project consists of a two-story building connected to a two aircraft hangar with a total area of 77,824 GSF Supply and support buildings are also located adjacent to the hangar. The Mission Control Center has three separate areas: the Command Area, the Squadron Operations Area and the Mission Control Station. This facility is designed to achieve LEED "Silver" rating by employing sustainable design principles and energy conservation methods.

Mission Control Complex

drag images

Health Care Environments
office interior front door to office large reception, sitting area
Federal Design
building facade warehouse interior courtyard